Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/soshr/web/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/soshr/web/wp-includes/functions.php on line 6114
Job detail - SOS HR Solutions

Scafolding Supervisor

GASCO
  • Direct
  • Not disclosed
  • Abu Dhabi

Job description

¿ To follow up, supervise and ensure that Scaffolding Works are executed by assigned personnel, in accordance with ISO 9001:2008 QMS procedures and HSE requirements and within the budget and time frame.
¿ To input, process and update MAXIMO Scaffolding Work Order to control Backlog in order to meet Integrity Compliance factor KPI.
¿ To ensure that all work orders properly close out with failure report and Booking of actual resources spent against correct GL Account.

Apply for this position

Allowed Type(s): .pdf, .doc, .docx