Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/soshr/web/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/soshr/web/wp-includes/functions.php on line 6114
Job detail - SOS HR Solutions

Metering Project Leader

TOTAL ABK
  • Contract
  • Not disclosed
  • Qatar

Job description

This vacancy is for our client, French Collaboration Company based in Qatar undertaking projects in oil & gas sector


Activities:

General:
¿ Be the lead for the development and the execution of the metering project
¿ Be the focus point of contact for any technical aspect associated with these subjects
¿ Be the focus point of contact with QP for the project specific aspects throughout all project phases.
¿ Liaise with the Corporate technical division and the EPQ technical entities for any technical points linked to the project
¿ Ensure that the HSE aspects are properly highlighted and covered through all phases of the project in line with the Company rules
¿ Be responsible of the application of company standards to the project
¿ Ensure that the project approval process as per company internal rules is well followed for the project
¿ Ensure adequate reporting throughout the project phases as required
¿ Act as the main point of Contact with QP for all aspect related to QP new metering rules or practices implementation
¿ Participate in QP metering meeting and act as EPQ technical representative in liaison with the technical head quarter relevant authorities
¿ Integrate QP metering requirement into the various phases of the metering project

Particular aspects:

1rst phase: perform a conceptual study
¿ Perform initial gap analysis for the platforms connected systems to define standards upgrade requirements
¿ Perform a survey of the existing to use it as basis of design for the conceptual study
¿ Screen and evaluate the various options and technical metering solutions
¿ Evaluate for each involved technical discipline the possible alternatives and possible innovations
¿ Use the support of third party specialist company to investigate all options and technical possibilities
¿ Highlight and identify internal and external interfaces and impact of proposed concepts
¿ Evaluate the implications of the construction/integration and commissioning aspects on the concept to select
¿ Assess the risks for the project
¿ Perform preliminary risk assessment on possible concepts and use results in screening
¿ Evaluate each option from a technical, cost and constructability point of view
¿ Propose and justify a final scenario for the project
¿ Evaluate the proposed solution from design, technological (performances) construction, commissioning, safety, operating, maintenance point of view
¿ Elaborate a safety concept brief for the project based on the proposed scenario
¿ Develop the conceptual study for the selected scenario and prepare the basis of design / SOR for the FEED phase

2nd Phase: FEED
¿ Prepare the call for tender for the FEED phase
¿ Launch the FEED and be the CY lead for the FEED execution
¿ Ensure technical consistency of the FEED results
¿ Prepare dossiers for EPCI phase calls for tenders in accordance with approved project execution strategy
¿ Identify possible LLI and organize procurement accordingly
¿ Define project execution strategy
¿ Identify any HSE particular risks and take them into account in FEED deliverable (in particular SIMOPS situations, lifting offshore, construction POB offshore, commissioning aspects)
¿ Develop project execution schedule with due consideration to possible interferences with production
¿ Prepare dossier for company project sanction (cost/Risks/schedule/project strategy)

3rd Phase: execution ¿ EPCI
¿ Issue EPCI phase call(s) for tender(s) in accordance with project execution strategy
¿ Initiate LLI procurement if required by project execution strategy
¿ Act as the Cy representative for the contracts linked to the EPCI phase
¿ Plan and implement CY organization for the different phases of the project execution
¿ Report cost, risks, planning, progress to the upper management
¿ Implement HSE management system for the project and issue a dedicated HSE plan
¿ Prepare, organize and supervise the offshore campaign
¿ Issue a final close-out report for the whole project

Qualification/Experience/Education:

¿ Technical skills in instrumentation engineering with experience and knowledge of oil and gas metering systems
¿ Oil & gas and if possible Offshore background
¿ Process knowledge
¿ Knowledge of Total referential
¿ Familiar with Total Technical Corporate division (TEC)
¿ Experience in projects (Total project by preference) ¿ Engineering & execution phases
¿ Potential for technical subjects management and coordination
¿ Graduated engineer or equivalent grade in university with 10 years minimum experience in the industry.

Expecting staring date: 15 November 2011
Contract duration: 1 year, renewable
Year of experience: 10 years
Contract Category: Senior
Position to report: Development Manager

Apply for this position

Allowed Type(s): .pdf, .doc, .docx